Site Navigation

Your Account

Choose Language

Help

Step Type:

Drag to rearrange

Gather twelve FSH screws and twelve T-nuts from the Frame Hardware bag.

Loosely install two screws and T-nuts in the holes for the tower extrusion slot in each corner bracket in both the base and top assemblies. The T-nut goes inside the slot.

The raised center side of the T-nut must be oriented as shown in the photo.

There should be three T-nuts left from the Frame Hardware bag. These will be used to mount the endstops in an upcoming step.

Your contributions are licensed under the open source Creative Commons license.