Skip to main content

Site Navigation

Your Account

Choose Language

Changes to Step #32

Edit by Michael Hackney

Edit approved by Michael Hackney

Deleted
Added
Unchanged

Step Lines

[title] Install LED wiring
[* red] Locate the ''LED Lighting'' bag in box C and remove the coil of black/red wire.
[* icon_note] Cut a length of 200mm (7-7/8") of wire off the bare ends of the ''LED wires'' (not the end with the connector installed). Save these pieces (one red and one black) – they will be used to connect the ''LED lighting strips'' later.
[* red] Insert one end of the pair of ''LED wires'' into the ''Z'' base extrusion the way you inserted the'' endstop wires''.
[* red] Pull the end of the'' LED wires ''out of the bottom of the tower extrusion.
[* red] Run the pair of ''LED wires'' up the channel parallel to the ''endstop wires''. Extend the ''LED wires'' about 150mm (6") beyond the ends of the'' endstop wires'' as shown in the photo.
[* red] Cover the wires with a piece of ''T-slot cover'' as you did for the ''endstop wires'' in towers ''X'' and ''Y''.
[* red] Loosely coil the ''three endstop ''wires and the ''LED wires'' in the base.