Skip to main content

Site Navigation

Your Account

Choose Language

Changes to Step #39

Edit by Michael Hackney

Edit approved by Michael Hackney

Deleted
Added
Unchanged

Step Lines

[title] Installing the top assembly on the towers
[* icon_note] The upper triangle must be installed with the labels you applied facing up. The holes
in the upperextrusion cross pieces must be closest to the bottom of the frame.
[* red] Align the T-nuts and carefully lower the top
assembly onto the towers. Wiggle and jiggle the T-nuts until the top assembly slides over both T-nuts in each corner bracket.
[* icon_note] It helps to have a helper with this step but it can be done alone if you align the T-nuts and work slowly.

[* black] Insert wisdom herered] Secure but do not tighten the screws with the towers even with the top of the assembly.
[title] Installing the top assembly on the towers
[* icon_note] The upper triangle must be installed with the labels you applied facing up. The holes
in the upperextrusion cross pieces must be closest to the bottom of the frame.
[* red] Align the T-nuts and carefully lower the top
assembly onto the towers. Wiggle and jiggle the T-nuts until the top assembly slides over both T-nuts in each corner bracket.
[* icon_note] It helps to have a helper with this step but it can be done alone if you align the T-nuts and work slowly.

[* black] Insert wisdom herered] Secure but do not tighten the screws with the towers even with the top of the assembly.

Image 1

No previous image

Added

Image 2

No previous image

Added